Upload a photo Upload a video Upload an mp3 Upload an event

News


Busy roads to undergo repair work

Friday January 22 2016


Road Closed Diversion Road Closed Diversion


A MAJOR scheme to repair some of Barnsley's worst roads will begin next month - costing over £1 million.

Contractor Derek Lewis Ltd, of Doncaster, will be carrying out resurfacing work on several of the town's main roads and road closures will be in place.

It will include works to 
* Doncaster Road, patch between Ardsley and Darfield (Road closed Feb 7 to 9) Sunday, 7 to Tuesday, 9 February.

* Allots Corner, Hoyland Common to Lidgett Garage will be closed overnight on Feb 19.

* Ingbirchworth to Hoylandswaine Roundabout

* Barnsley Road, Barugh – Patch near Dearne Hall Road

* A629 Wortley to Crane Moor

Coun Roy Miller said: “These works will greatly improve some of the borough’s most-used roads, which will benefit residents."

Leave a comment
comments powered by Disqus
12 Showing 12 comments

Reply Posted by Dave on Monday January 25 2016 at 21:44
And how much is been spent on the public pavements as most of these are just as bad as roads

Reply Posted by Mike Lee on Tuesday January 26 2016 at 10:06
Just returned home after Major back surgery in Sheffield. Journey not good but got infinitely worse in the Barnsley Borough particularly down Cemetery Road where there must be a "bump" every few yards. But have every confidence in Councillor Miller sorting it ALL out - Not!!!

Reply Posted by Karen Fletcher on Tuesday January 26 2016 at 12:40
What about Rowland Road, it's disgusting . To think it's a major road used for the hospital, it as more bumps and holes in it and half of it as no surface at all.It comes as no surprise many people are having serious car repairs. This road was last resurfaced in 1980/81, I was still at school ,I'm now 50.It's about time some thing was done and not just concentrating on the town centre.

Reply Posted by Jayne on Tuesday January 26 2016 at 17:33
It's a bit like sticking a plaster over Grand Canyon and thinking it's fixed. The council just do not, will not ever have enough funds and now never could keep up with the amount of required road repairs around the borough. just where does the road tax monies go to?

Reply Posted by John on Wednesday January 27 2016 at 12:19
Road fund licences get mixed in with general taxation. The money doesn't go specifically to fund roads.

Reply Posted by Tracy Maldzinski on Wednesday January 27 2016 at 11:02
Please consider re surfacing Rowland Road at Gawber. This has to be one of the worst roads in Barnsley.
Thanks.

Reply Posted by Stephen Speight on Wednesday January 27 2016 at 12:39
What about Roland rd it is littered with pot holes. Probably the worst road in Barnsley.

Reply Posted by ken on Wednesday January 27 2016 at 13:12
They should consider removing all the speed humps as they are dangerous and damage cars and cause back injuries. Why should everyone suffer because of inconsiderate drivers that love them whoevers idea this is must be mad

Reply Posted by Karen Fletcher on Wednesday January 27 2016 at 13:51
Now we learn that Rowland Road is be used for diversion traffic starting in February, while they close Victoria Road. Brilliant more traffic ,how much more traffic can one road take?

Reply Posted by Natalie on Sunday January 31 2016 at 17:16
The road outside holiday inn is a disgrace !!!

Reply Posted by Michelle on Sunday January 31 2016 at 18:01
At least they are trying to do something to some of the roads. Sheffield's roads are terrible. From getting off the motorway, down towards Hillsboro, through city centre and then out to Chesterfield.
Drive that route and you will definately realise that ours are bad but not that bad.

Reply Posted by Sue on Wednesday February 3 2016 at 06:58
Main road through GT Houghton needs doing....more pot holes than anything appearing around the speed bumps. In wet weather they look like small puddles. So much damage to people's cars